NEW QUESTION # 20
Which of the following models is a Huawei in-room chilled water horizontal air supply product?

  • A. NetCol5000-A070U
  • B. NetCol8000-C070D
  • C. FusionCol8000-C210H
  • D. FusionCol5000-A050H

Answer: D

Explanation:
Huawei room-level air conditioning products are commonly identified by the series name plus a model suffix that indicates the cooling medium and airflow form factor. Anin-room chilled waterunit uses a chilled-water coil as the primary heat-exchange component and relies on the building's chilled-water system (chiller/plant) rather than an onboard refrigeration compressor for cooling generation. "Horizontal air supply" describes the discharge direction: the unit supplies conditioned air laterally into the room or into a specific airflow organization (such as cold-aisle delivery), supporting predictable airflow paths and stable return air conditions. Within the provided options,FusionCol5000-A050His the model that matches both identifiers: it belongs to Huawei's room cooling product line and the model code indicates an in-room configuration withchilled-watercapability andhorizontalair supply orientation. The other options belong to different series or represent configurations typically associated with other deployment forms (such as different placement, airflow direction, or system architecture). Therefore, the correct selection isFusionCol5000-A050H.


NEW QUESTION # 21
After installing the FusionCol8000-C (110-440 kW), inject water to preserve the pressure for the chilled water pipes to how many MPa. After 30 minutes, check that no leakage occurs. Preserve the pressure for 24 hours. If the pressure drop is less than 0.01 MPa and no leakage occurs, the pipes do not leak.

  • A. 0
  • B. 0.8
  • C. 1.2
  • D. 0.5

Answer: B

Explanation:
For FusionCol8000-C chilled-water systems, Huawei commissioning requires awater leakage/pressure- holding teston the chilled-water piping after installation to verify joint sealing, valve interfaces, and connection integrity before long-term operation. The specified method is toraise the water pressure in the chilled-water pipe to 0.8 MPa, then observe for30 minutesto confirm there is no visible leakage. If the system remains dry, the same pressure isretained for 24 hoursas a stability verification step. The acceptance criterion is that thepressure drop is less than 0.01 MPaover the 24-hour period and no leakage is found, which demonstrates that the piping and fittings meet tightness requirements under the prescribed test pressure. This procedure helps prevent future failures such as slow seepage, corrosion around joints, insulation waterlogging, and unexpected shutdowns caused by water loss or low differential pressure alarms. It also ensures that subsequent flushing, venting, and operational commissioning can be performed safely and reliably.


NEW QUESTION # 22
What are the colors of indicators on the LCD panel of the MDU?

  • A. Yellow
  • B. Red
  • C. Orange
  • D. Green

Answer: A,B,D

Explanation:
On Huawei UPS systems (such as the UPS5000 series), the MDU LCD panel includes status indicators designed to provide an immediate visual understanding of the UPS operating condition and alarm severity.
The indicator system usesthree standard colors:green,yellow, andred.Greenindicates the UPS is operating normally and the power supply path is healthy.Yellowis used to show abnormal conditions that require attention, such as warnings or non-critical alarms, where the UPS can typically continue supplying power but O&M personnel should inspect and handle the issue within the required timeframe.Redindicates serious or critical conditions, such as major faults or alarms that may threaten continuous power supply or require urgent action according to operating procedures. These three colors align with the common Huawei alarm severity presentation logic on the UPS display and help technicians quickly judge whether the situation is normal, warning-level, or critical-level without entering deeper menus.Orangeis not used as an MDU indicator color in this context.


NEW QUESTION # 23
When the outdoor unit is installed at a position higher than the indoor unit, install an oil trap every five to six meters in the vertical direction along the gas pipe to ensure system reliability.

  • A. False
  • B. True

Answer: B

Explanation:
This statement is true. In split DX/precision cooling refrigerant systems, the "gas pipe" typically refers to thesuction linereturning refrigerant vapor (and entrained compressor oil) from the indoor evaporator to the outdoor unit/compressor. When theoutdoor unit is higher than the indoor unit, the suction line includes avertical riser. Oil naturally tends to settle and flow downward under gravity, so without proper piping measures, oil may accumulate in low points or fail to be carried upward consistently, leading topoor oil return.
Insufficient oil return can cause compressor lubrication issues, abnormal noise, overheating, reduced efficiency, and long-term reliability risks. Installingoil trapsat the bottom of the riser and thenevery 5-6 metersof vertical lift helps collect oil and allows it to be periodically swept upward by refrigerant velocity, maintaining stable oil circulation. This requirement is especially important in data center cooling because continuous operation and high availability demand reliable compressor lubrication and stable refrigerant flow under varying load conditions.


NEW QUESTION # 24
The default port number for logging in to the NetEco is

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: A

Explanation:
In Huawei NetEco access design, the Web client is reached usingHTTPSto protect credentials and management data in transit. During initial deployment and commissioning, engineers access the NetEco login page by entering the server IP address followed by thedefault HTTPS service port. Huawei's standard login method specifies that users open a browser and enterhttps://NetEcoserver IP:31943to access the NetEco login interface. This port is therefore treated as the default Web login port in typical on-premises NetEco deployments, and it is the baseline value referenced in installation and login guidance. Other ports may appear in specific tools, customized scenarios, version variants, reverse-proxy deployments, or when security policy requires port changes, but those are exceptions driven by planning or product packaging. For exam and commissioning purposes, the correct default login port is the one used by the NetEco Web client entry point under the standard deployment model:31943.


NEW QUESTION # 25
Which of the following are main components of Huawei indirect evaporative cooling system?

  • A. Fan
  • B. Air filter
  • C. Heat exchanger
  • D. Compressor
  • E. Spray system
  • F. Water pump

Answer: A,B,C,E,F

Explanation:
Huawei's indirect evaporative cooling system is designed to use theoutdoor air as a "free" cold sourcewhile keeping the data hall supply air isolated from outdoor contaminants and moisture. Its core is theheat exchanger, where heat from the indoor (return) air side is transferred to the outdoor working air side without mixing the two air streams. To enhance heat removal on the outdoor side, aspray systemwets the evaporation media or spray section, and awater pumpcirculates water to maintain uniform wetting and stable evaporation performance.Fansdrive airflow through the indoor and outdoor paths to ensure sufficient heat transfer and maintain the required air volume and pressure. Because outdoor air is involved on the working-air side,air filtersare required to reduce dust and protect the heat exchanger and internal airflow channels, improving reliability and reducing maintenance. Acompressoris not a main component of indirect evaporative cooling because the system primarily relies on evaporation and heat exchange rather than mechanical refrigeration.


NEW QUESTION # 26
Which of the following statements are true?

  • A. When the UPS works in normal mode, you can directly turn on the maintenance bypass switch.
  • B. Huawei UPS5000-H is a modular UPS. If a module fails, it can be replaced online.
  • C. When mains and bypass input of the UPSs share one power source, if mains outage occurs, the UPS cannot work in bypass mode.
  • D. When the UPS works in static bypass mode, if the mains input outage occurs suddenly, the UPS automatically switches to battery mode.

Answer: B,C,D

Explanation:
In Huawei UPS operating logic and standard data center O&M practice, themaintenance bypassis a mechanical path used to isolate the UPS for service. Innormal modethe load is carried by the inverter, so you shouldnot directly close the maintenance bypasswithout a controlled transfer procedure; doing so can create an unsafe parallel path or impact synchronization, therefore statementA is false. Instatic bypass mode, the load is supplied through the bypass path; if the bypass/mains source fails, the UPS can perform an automatic transfer from bypass to inverter, and the inverter will be supported by thebatterythrough the DC link, soB is trueunder the expected functional behavior.UPS5000-His designed as amodular UPS, supportingonline (hot) replacementof power modules to restore capacity without shutting down the entire system, soC is true. If therectifier mains input and bypass input share the same source, a mains outage removes the bypass source as well, meaning bypass operation is not available, soD is true.


NEW QUESTION # 27
Video management can connect to the third-party video surveillance subsystem and play historical videos.

  • A. False
  • B. True

Answer: B

Explanation:
In Huawei's data center O&M architecture, video is treated as an important auxiliary capability for security and remote operation. TheVideo Managementfunction is designed not only to view live camera feeds, but also to integrate video resources into the same O&M workflow as alarms, access control events, and environmental monitoring. In typical deployments, the actual video storage and recording are handled by athird-party video surveillance subsystem(for example, an NVR/VMS platform). Huawei's video management function can connect to that third-party subsystem so that camera resources can be accessed in a unified interface, allowing operators to perform linkage operations such as "view video on alarm" and routine security inspection without switching platforms. Because historical recordings are stored by the surveillance subsystem, once the integration is established and permissions are correctly configured, operators can retrieve andplay back historical videofor event tracing, audit, and incident investigation. This supports closed-loop O&M: alarm/event occurs # video verification # root-cause confirmation # maintenance action # evidence retention.


NEW QUESTION # 28
ECO mode is not recommended when the load is less than

  • A. 10%
  • B. 5%
  • C. 30%
  • D. 20%

Answer: D

Explanation:
ECO mode is designed to improve UPS efficiency by supplying the load mainly through the static bypass path when the mains is within the acceptable quality window, while keeping the inverter synchronized and ready to take over quickly if power quality degrades. However, when the load istoo light, the overall operating characteristics of the UPS system are less favorable for ECO operation. At low load levels, the benefits of ECO in reducing conversion losses are smaller, and the system becomes more sensitive to frequent transfers caused by minor mains fluctuations, which can increase transfer##and operational risk. In addition, very light loads can reduce the effectiveness of system self-check behaviors and may lead to less stable operating margins for parallel systems, power modules, and downstream distribution, depending on site conditions.
Therefore, Huawei O&M guidance sets a practical threshold and states thatECO mode is not recommended when the load is lower than 20%, helping ensure stable operation, fewer unnecessary transfers, and better overall power supply reliability for critical loads.


NEW QUESTION # 29
Which of the following is the cabling mode of external power cables in IT scenarios of the FusionDC1000A?

  • A. End door cabling
  • B. Top cabling
  • C. Bottom cabling
  • D. End wall cabling

Answer: C

Explanation:
In the FusionDC1000A IT scenario, the external input power cables are designed to enter the power distribution system throughdedicated cable inlets at the bottomof the Power PDB. During installation, the procedure requires opening the Power PDB, removing the plugs from thebottom cable holes, and routing the external input power cables into the cabinet through these bottom entries before arranging them along the nearby cable support/bridge inside the Power PDB area. After the cables are terminated (for example, L1/L2
/L3/N and PE), the bottom cable entries are resealed using waterproof sealing materials to maintain enclosure protection performance. This bottom-entry method supports reliable mechanical routing for thick/armored power cables, reduces bending stress, helps maintain orderly segregation from signal cabling, and improves on-site safety by guiding high-current cables through a controlled inlet path. Therefore, the correct cabling mode for external power cables in FusionDC1000A IT scenarios isbottom cabling.


NEW QUESTION # 30
Which of the following conditions will not cause the wizard startup commissioning to fail?

  • A. The condensate pump is stuck.
  • B. The electronic expansion valve is not opened.
  • C. The indoor fan 2 drive is faulty.
  • D. The water leakage rope is not installed.

Answer: D

Explanation:
Wizard startup commissioning is designed to verify that the unit'skey controllable subsystemscan be started, regulated, and protected correctly. Conditions that prevent a subsystem from operating normally will directly cause commissioning failure. If thecondensate pump is stuck, the drainage function cannot be validated and water may accumulate in the drain pan, which is treated as a functional fault during commissioning. Ifindoor fan 2 drive is faulty, the fan system cannot meet airflow requirements or redundancy expectations, so the fan commissioning item fails. If theelectronic expansion valve (EEV) is not opened, refrigerant flow and cooling control cannot be established, so the cooling system commissioning fails because the unit cannot build a stable refrigeration cycle or reach expected operating parameters.
In contrast, thewater leakage ropeis aprotective detection accessoryused for leak sensing and alarming. While it is important for site safety and recommended for operation, its absence typically does not block the unit from completing the functional commissioning steps for fans, cooling, and drainage; it mainly affects leak detection coverage and related alarms rather than the basic startup commissioning pass/fail.


NEW QUESTION # 31
The rated output capability of a single power module for the UPS5000-H is how many kVA.

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: A

Explanation:
Huawei UPS5000-H is a modular UPS platform built by paralleling standardized power modules inside the power cabinet to form different system capacities. In this architecture, the "single power module" is the basic building block that contributes a fixed rated apparent power to the total UPS capacity. For the UPS5000-H series, each power module is rated at100 kVA, and the system capacity is achieved by installing multiple 100 kVA modules and configuring redundancy (such as N+1). This modular approach improves availability and O&M efficiency because a failed module can be isolated and replaced without shutting down the entire UPS, while the remaining modules continue carrying the load within their capacity limits. Using 100 kVA as the module rating also simplifies planning: technicians can quickly estimate remaining headroom by counting active modules and comparing total available kVA/kW against the real-time load, ensuring the UPS stays within recommended loading and redundancy margins during maintenance or fault conditions.


NEW QUESTION # 32
If the SPD indicator of a smart module is green, the SPD is running properly. If the SPD indicator is red, the SPD is faulty and must be replaced immediately.

  • A. False
  • B. True

Answer: B

Explanation:
In Huawei data center power distribution design, theSPD (Surge Protective Device)provides overvoltage surge protection for sensitive loads by diverting transient energy to ground through internal protection components. The SPD status indicator is used for O&M judgment of protection availability. When the indicator isgreen, it indicates the SPD protection components arewithin normal working conditionand the surge protection path remains effective. When the indicator turnsred, it typically means the SPD's internal protection element hasdegraded or disconnected(end-of-life or failure after cumulative surges), and the device can no longer provide the rated protection level. In this condition, the distribution system is left exposed to surge risk, especially during thunderstorms, switching operations, or upstream disturbances. Therefore, Huawei O&M practice treats ared SPD indicator as a replacement trigger, requiring immediate corrective action: confirm alarm/status, ensure safe isolation following electrical safety procedures, and replace the SPD module to restore protection and maintain power system reliability.


NEW QUESTION # 33
Which of the following is the procedure for replacing a damaged UPS power module onsite?

  • A. ##
  • B. ##
  • C. ##
  • D. ##

Answer: D

Explanation:
For onsite replacement of a UPS power module, Huawei's maintenance logic follows a safe "isolate # remove
# insert # re-enable" sequence controlled by the moduleready switch. During removal, the ready switch must be rotated to theOFFstate first so the module is logically isolated from operation and will not participate in power conversion. After isolation, the four fixing screws are removed and a short waiting period is required to allow internal energy in capacitors to discharge before the module is pulled out. This matches statement#.
During installation, the ready switch must remainOFFbefore insertion to prevent unintended startup or arcing during connector engagement. The module is placed in position, inserted slowly and evenly until fully seated, then secured with the four screws. Only after mechanical fastening and full seating is confirmed should the ready switch be rotated to theONstate to allow the system to recognize and bring the module online. This matches statement#.


NEW QUESTION # 34
Which of the following is not a scenario-based solution for Huawei data center products?

  • A. FusionDC1000
  • B. FusionModule500
  • C. FusionModule2000
  • D. FusionDC800

Answer: D

Explanation:
Huawei's scenario-based data center facility portfolio is organized around clearly defined solution families that map to typical deployment scenarios and site sizes. FusionModule500 and FusionModule2000 are smart modular data center solutions designed for standardized, fast deployment in equipment rooms and enterprise edge/branch scenarios.They integrate key subsystems such as power supply and distribution, cooling, monitoring, and optional fire protection into a modular architecture that reduces footprint and accelerates on- site delivery. Likewise, FusionDC1000 is Huawei's prefabricated modular data center series, delivered as complete, factory-integrated modules that combine civil engineering elements with electromechanical infrastructure for rapid construction, predictable quality, and scalable expansion across different capacity tiers. In contrast, FusionDC800 is not used as a defined scenario-based solution name within Huawei's mainstream data center facility solution lineup (where "FusionDC" offerings are represented by the FusionDC1000 series and "FusionModule" offerings by numbered FusionModule solutions). Therefore, FusionDC800 is the option that does not match Huawei's scenario-based solution naming.


NEW QUESTION # 35
Which of the following statements is false about how to start an electric heater?

  • A. If "Dehumidification & Low temperature heating" is selected, the electric heater determines whether to start based on the temperature requirements when the dehumidification or heating conditions are met.
  • B. When "Dehumidification heating", "Low temperature heating", or "Dehumidification & Low temperature heating" is selected, if the temperature in the equipment room is low, the air conditioner automatically starts the heating function to meet the temperature control requirements of the equipment room.
  • C. When "Low temperature heating" is selected, the electric heater determines whether to start only based on the temperature requirements no matter whether the dehumidification function is enabled.
  • D. When "Dehumidification heating" is selected, the electric heater determines whether to start based on the current temperature only when the dehumidification function is enabled.

Answer: B

Explanation:
Huawei precision cooling logic separates heater enablement into distinct control strategies to avoid unnecessary heating and to keep humidity control stable. InLow temperature heating, the heater is governed purely by the room temperature control demand: if temperature is below the heating threshold (or below setpoint with heating conditions met), the heater can start regardless of whether dehumidification is enabled, which matches statement D. InDehumidification heating, the heater is not a general low-temperature heater; it is an auxiliary function used to prevent overcooling during dehumidification and to maintain temperature while the unit dehumidifies. Therefore, the heater in this mode is permitted to start only when thedehumidification function is activeand temperature conditions require compensation, which matches statement B. Statement C is false because it incorrectly claims thatanyof the three selections will start heating automatically whenever room temperature is low; that is not true for "Dehumidification heating" unless dehumidification is actually enabled and running.


NEW QUESTION # 36
If the startup password authentication for a smart module is not complete, the ECC800-Pro WebUI and app cannot be used for commissioning.

  • A. False
  • B. True

Answer: B

Explanation:
In Huawei smart module commissioning and O&M workflows,startup password authentication is a mandatory security initialization stepfor the controller and its management channels. The ECC800-Pro provides WebUI and mobile app access for tasks such as device discovery, parameter setting, site configuration, alarm verification, and functional commissioning. Before these commissioning functions are allowed, the system requires completion of startup authentication actions, typically includinginitial password setup or password change, confirmation of authentication policies, and activation of secure access control. This prevents unauthorized users from entering the management plane during the critical initial stage when default credentials or incomplete security settings could exist. If startup password authentication is not completed, the platform restricts access to commissioning pages and app-based commissioning features, ensuring that configuration changes, device binding, and control operations cannot be executed until the controller is placed into a compliant, secured state. This design aligns with data center facility management best practices where commissioning must begin only after management access is hardened and auditable.


NEW QUESTION # 37
The FusionCol8000-A230 unit uses two systems. Each system uses three compressors connected in parallel and two EEVs.

  • A. False
  • B. True

Answer: A

Explanation:
For FusionCol8000-A230, the "two systems" part is correct: Huawei's quick guide explicitly states that theindoor and outdoor units consist of two independent cooling systems, which is the basis for redundancy and staged capacity control.
However, the rest of the statement ("each system uses three compressors connected in parallel and two EEVs") is not supported as a fixed, universal configuration in the installation/commissioning guide text that is available here. In Huawei smart cooling designs, compressor quantity and the number of electronic expansion valves (EEVs) aremodel- and configuration-dependentand are tied to how the refrigerant circuit is partitioned (for example, multiple compressor stages for capacity modulation, and one or more EEVs for different evaporator branches). Because the documentation we can directly verify confirmstwo independent systemsbut doesnotconfirm "three compressors per system" as an explicit requirement, the combined statement (two systems + specific compressor/EEV counts) is judgedfalse: one part is verified true, while the detailed component count cannot be confirmed as stated.


NEW QUESTION # 38
After the unit is powered on for the first time, it enters the compressor preheating state. To quickly perform power-on commissioning, you can manually shut down the compressor preheating.

  • A. False
  • B. True

Answer: A

Explanation:
Compressor preheating is a protection mechanism used during first power-on (and after long power-off periods) to improve compressor reliability before allowing refrigeration startup. The preheating function warms the compressor oil and reduces refrigerant migration and oil dilution, which otherwise can lead to liquid refrigerant in the compressor crankcase. If the compressor starts when oil is diluted or when liquid refrigerant is present, it increases the risk of abnormal noise, poor lubrication, high mechanical stress, and even liquid strike, which can damage the compressor and shorten service life. For data center cooling equipment, where continuous reliability is essential, the commissioning logic treats preheating as a required prerequisite for safe compressor operation. Therefore, O&M practice does not recommend bypassing or manually shutting down compressor preheating just to accelerate commissioning. The correct approach is to keep the unit energized and allow the preheating period to complete, then proceed with commissioning steps (fans, cooling system tests, alarms, and control verification) under proper protection conditions.


NEW QUESTION # 39
Which layout principle best aligns with Huawei data center facility design for improving cooling efficiency and reducing mixing of hot and cold air?

  • A. Keep all cabinet doors open to minimize local hotspots
  • B. Distribute racks randomly to balance floor loading
  • C. Place CRAC/CRAH units only along the perimeter without airflow planning
  • D. Implement hot aisle/cold aisle arrangement with aisle containment

Answer: D

Explanation:
Huawei data center facility design emphasizes controlling airflow paths to raise cooling efficiency and stabilize IT inlet temperatures. The hot aisle/cold aisle layout creates a predictable airflow direction:
cold air is supplied to the front of IT racks (cold aisle), while hot exhaust air is isolated and returned to the cooling system (hot aisle). When aisle containment is added, it prevents hot and cold air from mixing, which directly improves cooling utilization, reduces overcooling demand, and lowers fan energy. This layout also supports more accurate temperature control, enabling higher supply air temperatures while still meeting server inlet requirements-an important lever for improving overall energy efficiency. Huawei modular and smart module concepts commonly standardize rack alignment, containment components, and sensor-based monitoring so the airflow system remains consistent as capacity scales. Compared with random rack placement or uncontrolled airflow, containment-based hot
/cold aisle planning delivers measurable operational stability, simpler troubleshooting, and better conditions for capacity expansion without redesigning the entire cooling path.


NEW QUESTION # 40
......

Exam Engine for H20-923_V1.0 Exam Free Demo & 365 Day Updates: https://www.exam4pdf.com/H20-923_V1.0-dumps-torrent.html

Test Engine to Practice Test for H20-923_V1.0 Valid and Updated Dumps: https://drive.google.com/open?id=1Zh7C2G-pzCIBmHb4RAYnzwCgj5KseeYf