[Oct 13, 2023] Fully Updated Dumps PDF - Latest C-IBP-2211 Exam Questions and Answers [Q33-Q50]

Share

[Oct 13, 2023] Fully Updated Dumps PDF - Latest C-IBP-2211 Exam Questions and Answers

100% Free C-IBP-2211 Exam Dumps to Pass Exam Easily from Exam4PDF


SAP C_IBP_2211 certification exam covers a range of topics such as demand planning, inventory planning, supply planning, sales and operations planning, and control tower functionality. Candidates must have a thorough understanding of these areas and demonstrate their ability to configure and implement SAP IBP for supply chain solutions in a real-world scenario.

 

NEW QUESTION # 33
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note: There are 3 correct answers to this question.

  • A. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
  • B. It checks whether the sourcing in the Production Source Item Master Data type exists.
  • C. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
  • D. It checks whether the required planning level master data exists for a subset of input key figures.
  • E. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.

Answer: C,D,E


NEW QUESTION # 34
You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to the PERPRODCUST level.Which of the following configuration options are possible for this process?Note: There are 2 correct answers to this question.

  • A. Splitting the values from aggregated to detailed level, based on a stored split-factor key figure
  • B. Splitting the values from aggregated to detailed level, based on the time profile attribute
  • C. Splitting the values from aggregated to detailed level using multiplication by the proportions
  • D. Splitting the values from detailed to aggregated level by using a copy operator

Answer: A,C


NEW QUESTION # 35
How can the SAP IBP scenario modeling functionality support business users in the S&OP planning cycle?Note: There are 2 correct answers to this question.

  • A. Simulate statistical forecast at the Demand Review stage
  • B. Simulate heuristics run in Supply Review stage
  • C. Simulate demand sensing inputs for Supply Review
  • D. Model inventory turns based on Target Safety stocks

Answer: A,B


NEW QUESTION # 36
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note: There are 3 correct answers to this question.

  • A. You can only apply one value-based filter per planning view.
  • B. These filters can be used together with attribute totals in the same planning view.
  • C. The alerts dashboard is not available if a value-based filter is set for the open planning view.
  • D. These filters are always applied based on the values stored in the database.
  • E. You can add (or delete) planning objects to a planning view after these filters are applied.

Answer: A,C,D


NEW QUESTION # 37
What is a prerequisite for modeling outsourced manufacturers with production capacity using the Supply Optimizer?

  • A. Model target inventory and stocks at the outsourced manufacturing location
  • B. Ensure that the outsourced manufacturing locations have a separate subnetwork
  • C. Model relative production costs across internal locations and outsourced manufacturing locations
  • D. Use production lead times and offsets to manage components at the outsourced manufacturing location

Answer: C


NEW QUESTION # 38
You are starting a new implementation project for SAP IBP and are considering the possible system architecture.What are the possible approaches for setting up the system landscape?Note: There are 2 correct answers to this question.

  • A. Set up a three-tier landscape using transport, starting from the development system to test and production.
  • B. Create additional test planning areas in the production system to support cutover needs.
  • C. Create additional planning areas in the test system to support training needs.
  • D. Set up a two-tier landscape, and have the configuration of the development system regularly updated from the production system.

Answer: A,D


NEW QUESTION # 39
You are configuring disaggregation for the KF1 key figure in the Planning Areas Model Configuration app.Which methods can you use?Note: There are 3 correct answers to this question.

  • A. Disaggregation according to an equal split
  • B. Proportional disaggregation by using KF2 in the expression
  • C. Disaggregation according to a user-defined expression
  • D. Disaggregation in batch triggered by an application job
  • E. Disaggregation according to a helper key figure

Answer: A,B,C


NEW QUESTION # 40
You need to use your resource cost effectively with a certain minimum use, even if it means producing more than demand.Which solutions would apply to this scenario?Note: There are 2 correct answers to this question.

  • A. Excess stock can be generated and will need to be staged in an overflow warehouse.
  • B. Minimum capacity utilization will result in pull production occurring.
  • C. Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs.
  • D. Capacity leveling will be possible for production and storage resources.

Answer: A,C


NEW QUESTION # 41
Which of the following approaches could you take to reduce run times of an optimizer?Note: There are
3 correct answers to this question.

  • A. Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.
  • B. Increase the use of incremental lot size beyond the frozen horizon.
  • C. Split into multiple planning areas to support weekly vs. daily planning needs.
  • D. Avoid using telescopic time buckets.
  • E. Keep the number of fairshare segments small.

Answer: A,C,D


NEW QUESTION # 42
SAP IBP ensures interoperability with which applications?Note: There are 2 correct answers to this question.

  • A. Business Network in SAP Ariba
  • B. Salesforce Sales Cloud
  • C. User management in SAP Success Factors
  • D. Financial Planning in SAP Analytics Cloud

Answer: A,D


NEW QUESTION # 43
What are some of the available ABC segmentation methods in SAP IBP?Note: There are 2 correct answers to this question.

  • A. By Number of Items (Sorted Average)
  • B. By Pareto Principle (Sorted and Cumulated %)
  • C. By Number of Items (Sorted Values)
  • D. By Pareto Principle (Sorted and Calculated Values)

Answer: C,D


NEW QUESTION # 44
Which are the mandatory preconditions for an attribute that can be used for saving the segmentation results?Note: There are 2 correct answers to this question.

  • A. The attribute belongs to a simple or compound master data type.
  • B. The Business Meaning of the attribute has been specified.
  • C. The attribute should be a non-key attribute of the master data type.
  • D. The attribute should be assigned to all planning levels.

Answer: A,C


NEW QUESTION # 45
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note:
There are 3 correct answers to this question.

  • A. You can only apply one value-based filter per planning view.
  • B. These filters can be used together with attribute totals in the same planning view.
  • C. The alerts dashboard is not available if a value-based filter is set for the open planning view.
  • D. These filters are always applied based on the values stored in the database.
  • E. You can add (or delete) planning objects to a planning view after these filters are applied.

Answer: A,C,D


NEW QUESTION # 46
For which of the following application jobs can you enter planning filters as parameters?Note: There are
2 correct answers to this question.

  • A. Create Time Periods for Time Profiles
  • B. Purge Non-Conforming Data
  • C. Purge Key Figure Data
  • D. Purge Master Data

Answer: C,D


NEW QUESTION # 47
Which functional capabilities are included in SAP IBP for response and supply?Note: There are 2 correct answers to this question.

  • A. Planning with Product Allocations
  • B. Analyze Supply Usage
  • C. Gating Factors
  • D. Detailed Production Scheduling

Answer: B,C


NEW QUESTION # 48
What actions can be performed in the Advanced Dashboards application?Note: There are 3 correct answers to this question.

  • A. Use drill-down functionality.
  • B. Rename the charts.
  • C. Add process templates.
  • D. Display all assigned analytics on a single UI.
  • E. Link two analytics charts.

Answer: A,C,D


NEW QUESTION # 49
Which of the following data can be tracked using a change-history-enabled key figure?Note: There are 3 correct answers to this question.

  • A. Key figure type
  • B. Scenario ID
  • C. Reason code
  • D. Modified date
  • E. Attributes

Answer: C,D,E


NEW QUESTION # 50
......

Free C-IBP-2211 Exam Questions C-IBP-2211 Actual Free Exam Questions: https://www.exam4pdf.com/C-IBP-2211-dumps-torrent.html

Verified C-IBP-2211 dumps and 80 unique questions: https://drive.google.com/open?id=1ENMI35OH6-Sx77seorPW4GBbD5lEHbYx