NEW QUESTION 31
When would you use reporting point backflush in repetitive manufacturing?
There are 2 correct answers to this question.
Response:

  • A. For production lines with short lead times
  • B. You require an up-to-date inventory for components
  • C. When you need to determine the work in progress
  • D. When goods issues can wait for final confirmation

Answer: C,D

 

NEW QUESTION 32
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: There are 2 correct answers to this question.

  • A. Checking control must have an overall profile assigned in customizing.
  • B. Checking rule and group must be assigned.
  • C. Indicator Relevant for finite scheduling must be set.
  • D. PRT Availability check must be set.

Answer: A,C

 

NEW QUESTION 33
Which warehouse management functions are available in SAP EWM but NOT in SAP WM?
There are 3 correct answers to this question.
Response:

  • A. Expected goods receipt
  • B. Yard Management
  • C. Handling Unit Management
  • D. Labor Management
  • E. Slotting

Answer: A,D,E

 

NEW QUESTION 34
Where do you maintain the duration of a product on operation?

  • A. Routing
  • B. Bill of material (BOM)
  • C. Material master
  • D. Work instructions

Answer: A

 

NEW QUESTION 35
What is SAP's strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing?
Please choose the correct answer.
Response:

  • A. Flexible Planning
  • B. Integrated Business Planning
  • C. APO Demand Planning
  • D. PP Standard Sales and Operations Planning

Answer: B

 

NEW QUESTION 36
You have maintained the parameters for simple discontinuation the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

  • A. Kanban
  • B. Production order release
  • C. Material requirements planning
  • D. Back flushing

Answer: C

 

NEW QUESTION 37
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders?
There are 2 correct answers to this question.
Response:

  • A. Work center
  • B. Material master
  • C. Routing header
  • D. Bill of material

Answer: B,D

 

NEW QUESTION 38
How does the new Inventory Management Data model contribute to the reduction of the data footprint?
There are 3 correct answers to this question.
Response:

  • A. By eliminating inventory tables
  • B. By eliminating fields for different stock types
  • C. By eliminating material master tables
  • D. By eliminating hybrid tables
  • E. By eliminating inventory history tables

Answer: A,B,E

 

NEW QUESTION 39
Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability.
Which information is required to implement this change request in the scope of check?
There are 2 correct answers to this question.
Response:

  • A. The ATP category for restricted-use stock
  • B. The checking group from the material master
  • C. The checking control for the order type
  • D. The checking rule from the business application

Answer: B,D

 

NEW QUESTION 40
What are the consequences if operation status Dispatched is set for a production order operation?

  • A. You can reschedule the order using material requirements planning.
  • B. You can reschedule the operation using lead the scheduling.
  • C. You can reschedule the operation using finite Scheduling in a planning board.
  • D. You can reschedule the order using lead time scheduling.

Answer: C

 

NEW QUESTION 41
How Is the bill of material (BOM) exploded when you use a BOM explosion number?
Please choose the correct answer.
Response:

  • A. With respect to a common change status for product and each assembly
  • B. With respect to defined separate key dates for product and each assembly
  • C. With respect to a common key date for product and each assembly
  • D. With respect to a defined separate change status for product and each assembly

Answer: B

 

NEW QUESTION 42
Which document is skipped when SAP EWM is embedded in SAP S/4HANA?
Please choose the correct answer.
Response:

  • A. Warehouse order
  • B. Outbound delivery order
  • C. Outbound delivery request
  • D. Warehouse task

Answer: C

 

NEW QUESTION 43
Which of the following data objects are updated when a user confirms an operation?
Please choose the correct answer.
Response:

  • A. Production order header status
  • B. Production order total order quantity
  • C. Shop floor information system
  • D. Warehouse transfer order status

Answer: C

 

NEW QUESTION 44
In a production process, you need a certain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

  • A. Backflushing
  • B. Transfer Order
  • C. Kanban
  • D. Picking list

Answer: D

 

NEW QUESTION 45
Which material-specific information can be transferred to a transportation lane in PP/DS?
There are 3 correct answers to this question.
Response:

  • A. Purchasing info records
  • B. Outline agreement
  • C. Quota arrangements
  • D. Production versions
  • E. Special procurement keys

Answer: A,B,E

 

NEW QUESTION 46
Which process order function uses a resource network?
Please choose the correct answer.
Response:

  • A. Resource selection
  • B. Capacity planning
  • C. Resource scheduling
  • D. Capacity leveling

Answer: A

 

NEW QUESTION 47
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?

  • A. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
  • B. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
  • C. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
  • D. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator

Answer: B

 

NEW QUESTION 48
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.

  • A. Setup time
  • B. Planned delivery time
  • C. Float after production
  • D. Total replenishment lead time

Answer: B,C

 

NEW QUESTION 49
A planner updated a production order status from partially confirmed "PCNF" to technically completed "TECO" by mistake.
What impact would this have to other users for this specific production order?
Please choose the correct answer.
Response:

  • A. The warehouse clerk still carry out goods issue transactions
  • B. The production operator cannot enter additional confirmations
  • C. The buyer can still see component reservations
  • D. The production manager can still see the capacity requirements

Answer: B

 

NEW QUESTION 50
Which of the following are included as SAP S/4HANA Sales Simplifications?
There are 3 correct answers to this question.
Response:

  • A. SAP order Fulfillment replaces ERP SD Availability Checking
  • B. SAP Sales Support replaces SAP CRM
  • C. SAP Revenue Accounting replaces ERP SD Revenue Recognition
  • D. SAP GTS replaces ERP SD Foreign Trade
  • E. Settlement Management replaces ERP SD Rebates

Answer: C,D,E

 

NEW QUESTION 51
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?
Please choose the correct answer.
Response:

  • A. The Planning Strategy of the finished product
  • B. The item category of the component in the BOM
  • C. The Individual/Collective indicator of the component
  • D. The MRP Type of the component

Answer: A

 

NEW QUESTION 52
When can the material availability check occur automatically in a production order? Note: There are 2 correct answers to this question.

  • A. At order confirmation
  • B. At order settlement
  • C. At order release
  • D. At order creation

Answer: C,D

 

NEW QUESTION 53
Which data object can be updated with the scheduling results of a routing?
Please choose the correct answer.
Response:

  • A. Material master
  • B. MRP profile
  • C. Production scheduling profile
  • D. Production version

Answer: A

 

NEW QUESTION 54
......


C_TS422_1909 Exam Certification Details:

Exam:80 questions
Cut Score:55%
Level:Associate
Duration:180 mins
Sample Questions: SAP C_TS422_1909 Exam Sample Question
Languages:German, English, French, Chinese

 

Real SAP C_TS422_1909 Exam Dumps with Correct 91 Questions and Answers: https://www.exam4pdf.com/C_TS422_1909-dumps-torrent.html