
Sep-2021 Latest Exam4PDF E_S4HCON2020 Exam Dumps with PDF and Exam Engine Free Updated Today!
Following are some new E_S4HCON2020 Real Exam Questions!
NEW QUESTION 25
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error?
There are 2 correct answers to this question.
Response:
- A. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log
- B. In the job log for the corresponding job in SM37 (Job Overview)
- C. In the corresponding R3trans log files of this phase
- D. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
Answer: A,B
NEW QUESTION 26
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database?
Please choose the correct answer.
Response:
- A. Generate it by analyzing the specific custom code via RFC
- B. Download it from SAP Support Portal
- C. Apply the corresponding SAP note via SAP Note Assistant
- D. Configure it within transaction ATC
Answer: B
NEW QUESTION 27
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:
- A. Creation of the table structures in the new SAP HANA database
- B. Execution of eCATTs for business validation tests
- C. Execution of SPAU modification adjustment
- D. Execution of SPDD modification adjustment
- E. Execution of XPRAs and AIMs
Answer: B,C,E
NEW QUESTION 28
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.
- A. During SPDD
- B. During uptime
- C. During downtime
- D. Post-downtime
Answer: B,D
NEW QUESTION 29
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.
Response:
- A. During SPDD
- B. During uptime
- C. During downtime
- D. Post-downtime
Answer: B,D
NEW QUESTION 30
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:
- A. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
- B. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
- C. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
- D. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
Answer: A
NEW QUESTION 31
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:
- A. Upgrading to SAP ECC 6.08 without using DMO
- B. Using DMO when applying Support Packages to SAP ECC 6.07
- C. Updating to SAP ECC 6.07 using DMO
- D. SAP S/4HANA conversion to SAP S/4HANA 1709
Answer: A,D
NEW QUESTION 32
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.
- A. The SI checks are executed in the development system and the results are transported into the subsequent systems.
- B. Depending on the SAP S/4HANA version, there are different SI check frameworks.
- C. You need to build up a SI check framework by applying SAP notes.
- D. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
Answer: B,C
NEW QUESTION 33
During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?
- A. SUM continues with the next phase and your modifications are kept as In the start release
- B. SUM continues with the next phase and your modifications are lost
- C. Before continuing with the next phase SUM asks for a modification adjustment transport
- D. SUM refuses to continue unless you have marked a transport request as modification adjustment transport
Answer: A
NEW QUESTION 34
In ICNV. How database operations synchronized between the source and the target table?
- A. Deletes are directly executed in the target table by delete trigger.
- B. AA
Answer: A
NEW QUESTION 35
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:
- A. Activate the required business functions manually in the production system.
- B. During conversion, SUM delivers some business functions already activated.
- C. Import a transport request from the development system that contains the recording of the activation.
- D. Specify the business functions that need to be switched on during the prepare part of SUM.
Answer: B,C
NEW QUESTION 36
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:
- A. Keep archiving on during the whole procedure.
- B. Reuse a profile for the shadow instance from a previous run.
- C. Use the Near Zero Downtime Maintenance Technology (NZDM).
- D. Choose the instance number of the shadow instance.
Answer: B,D
NEW QUESTION 37
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
- A. Import of dictionary objects from the download directory in phase DDIC_UPG
- B. Activation of dictionary objects in phase ACT_UPG
- C. Import of upgrade and language data from the download directory in phase TABIM UPG
- D. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
- E. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
Answer: A,B,C
NEW QUESTION 38
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.
- A. DMO can only be run with systems NW740 or NW731
- B. A
- C. Target DB size will increase temporarily
Answer: A,C
NEW QUESTION 39
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host agent determine the path to the SUM directory?
- A. The path was stored in file sumabap.conf during registration
- B. AA
Answer: A
NEW QUESTION 40
What are the benefits of using the Benchmarking option of the DMO for SUM?
There are 2 correct answers to this question.
Response:
- A. You can verify that the content of the download directory matches the stack.XML file.
- B. You can find the optimal number of parallel R3load processes by monitoring host performance.
- C. You can record the modification adjustment during migration and use the transports in the next runs.
- D. You can obtain migration duration files that can be used to optimize the next runs from a previous benchmark run.
Answer: B,D
NEW QUESTION 41
- A. Kernel for target release, Linux, SAP HANA
- B. Kernel for target release, Windows, SAP HANA
- C. You are performing the corresponding maintenance transaction with the Maintenance Planner.
Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response: - D. Kernel for target release, Windows, SAP MaxDB
- E. Kernel for source release, Windows, SAP MaxDB
Answer: B,C,E
NEW QUESTION 42
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:
- A. SUM without DMO
- B. SWPM using the Load procedure
- C. SWPM using the Backup / Restore procedure
- D. SUM with DMO
Answer: B
NEW QUESTION 43
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:
- A. Check the compatibility of custom code with SAP S/4HANA
- B. Apply the recommendations of the simplification list
- C. Run the database migration to the SAP HANA database
- D. Perform the migration of data into the new data structure
Answer: A,B
NEW QUESTION 44
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step
"Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:
- A. The SAP Support Packages that will be bound to the upgrade
- B. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
- C. The SAP Support Packages contained in the upgrade media
- D. The SAP Support Packages found in the download directory
Answer: D
NEW QUESTION 45
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:
- A. Downtime migration (EU_CLONE_MIG_DT_RUN)
- B. Parallel distribution (PARDIST_SHD)
- C. Uptime migration (EU_CLONE_MIG_UT_RUN)
- D. Shadow repository creation (EU_IMPORT*)
Answer: C
NEW QUESTION 46
- A. Kernel for target release, Linux, SAP HANA
- B. You are performing the corresponding maintenance transaction with the Maintenance Planner.
Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response: - C. Kernel for target release, Windows, SAP HANA
- D. Kernel for target release, Windows, SAP MaxDB
- E. Kernel for source release, Windows, SAP MaxDB
Answer: C,E
NEW QUESTION 47
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.
- A. Kernel for target release, Linux, SAP HANA
- B. Kernel for target release, Windows, SAP HANA
- C. Kernel for target release, Windows, SAP MaxDB
- D. Kernel for source release, Windows, SAP MaxDB
Answer: B,D
NEW QUESTION 48
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:
- A. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
- B. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
- C. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
- D. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
Answer: B
NEW QUESTION 49
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
The source system is non-Unicode and the target database is a scale-out system.
What do you need to consider?
There are 2 correct answers to this question.
- A. The target database size increases temporarily because of the Shadow Repository.
- B. SAP HANA Landscape Reorganization requires a manual step to edit a file.
- C. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
- D. Network capacity between exporting and importing R31oad processes must be considered.
Answer: B,C
NEW QUESTION 50
......
Resources From:
- 2021 Latest Exam4PDF E_S4HCON2020 Exam Dumps (PDF & Exam Engine) Free Share: https://www.exam4pdf.com/E_S4HCON2020-dumps-torrent.html
Free Resources from Exam4PDF, We Devoted to Helping You 100% Pass All Exams!

